Seller has recently painted home, refinished floors, parged basement, new light fixtures, repaired bathroom plumbing. In repair of bathroom plumbing, contractor had an overflow into kitchen ceiling. That will be repaired by the contractor. Bathtub in bathroom to be refurbished. All items on the back patio will be removed.
PALA2018554
Condo, Townhouse, Traditional, 3+ Story
5
LANCASTER
1 Full
1912
0.05
Acres
Public
3
Brick
Public Sewer
Loading...
The scores below measure the walkability of the address, access to public transit of the area and the convenience of using a bike on a scale of 1-100
Walk Score
Transit Score
Bike Score
Loading...
Loading...